Project information

Smith Civil Engineering became involved in this, our second wind farm project which required us to supply and install the roadways, piling mats and crane hard standing to a high tolerance.

The scope of our works also included the excavation of the foundations and the cutting of 450 x450 mm piles and grading of excavations.

Once the 125m turbines had been erected SCE then had to reinstate bell mouths and roadways as well as install cabling and trimming site to its original condition.